Primary sources · Edited by Axel Hernborg · Updated

157 EV Charging Statistics for 2026

There were more than 7 million public charging points worldwide at the end of 2025 on IEA estimates, and more than 43 million private ones at homes and workplaces. China's National Energy Administration counted 24.777 million charging connectors at the end of September 2026. The EU had 950,397 public AC points and 226,157 DC points, the UK had 124,738 public chargers on 1 October 2026 and the US had 263,858 public charging ports on 7 November 2026.

  • 7 million Nearly 1.8 million public charging points were added worldwide in 2025, taking the total to more than 7 million. (IEA (Global EV Outlook 2026), May 2026)
  • 43 million More than 43 million private charging points, at homes and workplaces, were in use worldwide in 2025, on an IEA estimate. (IEA (Global EV Outlook 2026), May 2026)
  • 75% EV owners charge at home or at work almost 75% of the time and at public fast chargers only 10% of the time. (IEA (Global EV Outlook 2026), May 2026)
  • 240% Electricity from public fast chargers can cost up to 240% more than residential tariffs. (IEA (Global EV Outlook 2026), May 2026)

Headline figures

  • China had 24.777 million EV charging connectors at the end of September 2026, up 37.2% in a year, and 5.207 million of them were public. (National Energy Administration (China), Oct 2026)
  • The EU-27 had 950,397 public AC recharging points and 226,157 DC points in September 2026. (European Alternative Fuels Observatory, Sep 2026)
  • Germany had 214,334 public charging points in operation on 1 September 2026, on the Bundesnetzagentur register. (Bundesnetzagentur, Sep 2026)
  • The UK had 124,738 public EV chargers on 1 October 2026, and 29,722 of them were rated 50 kW or above. (DfT, Oct 2026)
  • The US had 263,858 public EV charging ports at 83,972 locations on 7 November 2026. (US DOE (AFDC), Nov 2026)
  • California had 225,225 public and shared private EV charging ports on 30 June 2026, on California Energy Commission counts. (California Energy Commission, Oct 2026)
  • Each charging port built with US federal NEVI money must have an average annual uptime of greater than 97%. (eCFR (23 CFR Part 680), Nov 2026)
  • UK law requires each network of rapid charge points to be reliable, on average, for 99% of the time in each calendar year. (legislation.gov.uk (Public Charge Point Regulations 2023), Nov 2023)
  • A 2023 national laboratory study for the US government found the US would need about 28 million charging ports to support 33 million plug-in vehicles in 2030. (NREL (for US DOE), Jun 2023)
  • The world's EVs used around 250 TWh of electricity in 2025, about 1% of final electricity demand. (IEA (Global EV Outlook 2026), May 2026)

This page gathers the current figures on EV charging in one place: public chargers worldwide and by country, how fast they are and how often they are used, home charging, what charging costs, the rules on reliability and payment, chargers for trucks, battery swapping, the load on the grid and forecasts to 2035. Every number links to the body that published it, with the date.

Charging counts are easy to compare wrongly, because producers count different things. The IEA counts charging points, China's NEA counts connectors, the UK's DfT counts chargers (and before 2026 counted charging devices), the US Department of Energy counts ports and India counts stations. Each figure here names its producer and unit, each country uses one producer, and counts from different producers are not added up, compared or charted together.

How many public EV chargers are there worldwide?

Public charging is growing fast worldwide, but private chargers at homes and workplaces still far outnumber public ones, on IEA estimates. Europe added slightly fewer public points in 2025 than in its record year of 2024.

1.3m 2020 2.7m 2022 >5m 2024 >7m 2025
View data table
Public charging points worldwide at the end of each year, in millions, on IEA estimates. Each year comes from the release for that year; the link is to the latest one. The 2024 and 2025 bars show the IEA's "more than".
PeriodValue
20201.3m
20222.7m
2024>5m
2025>7m
Public charging points worldwide at the end of each year, in millions, on IEA estimates. Each year comes from the release for that year; the link is to the latest one. The 2024 and 2025 bars show the IEA's "more than". (IEA (Global EV Outlook 2026), May 2026)
  • The public charging stock grew by more than 33% in 2025, and there were around 11 electric light-duty vehicles for each public charging point worldwide, similar to 2024. (IEA (Global EV Outlook 2026), May 2026)
  • There was 4.5 kW of public charging capacity for each electric light-duty vehicle worldwide at the end of 2025. (IEA (Global EV Outlook 2026), May 2026)
  • The world's private charging points support an electric light-duty fleet of around 76 million. (IEA (Global EV Outlook 2026), May 2026)
  • Around 45% of public charging points newly installed in 2025 were fast or ultra-fast, rated 22 kW or more. (IEA (GEVO 2026 webinar slides), May 2026)
  • More than 1.3 million public charging points were added worldwide in 2024, over 30% growth, taking the stock to more than 5 million, double the 2022 level. (IEA (Global EV Outlook 2025), May 2025)
  • The number of public charging points installed worldwide rose 40% in 2023, and fast chargers grew faster than slow ones. (IEA (Global EV Outlook 2024), Apr 2024)
  • There were 2.7 million public charging points worldwide at the end of 2022, more than 900,000 of them installed that year, about a 55% increase on the 2021 stock. (IEA (Global EV Outlook 2023), Apr 2023)
  • Publicly accessible chargers reached 1.3 million worldwide in 2020, 30% of them fast; installations rose 45% that year, against 85% in 2019. (IEA (Global EV Outlook 2021), Apr 2021)
  • Europe's public charging points grew more than 35% in 2024 to just over 1 million. (IEA (Global EV Outlook 2025), May 2025)
  • Europe added a record of about 270,000 public charging points in 2024 and around 260,000 in 2025, when its public stock rose about 20%. (IEA (Global EV Outlook 2026), May 2026)

IEA figures count public charging points for light-duty vehicles; the 2020 figure counts publicly accessible chargers. Each edition can revise earlier years, so values from different editions are a guide, not one consistent series. The IEA's Europe includes the UK, Norway and other countries outside the EU. Country counts on this page come from national bodies or EAFO and are not compared with the IEA's regional totals. Private points are a separate IEA estimate and are not added to public ones.

How many EVs share each public charger in other countries?

In Brazil and Thailand, electric car fleets grew faster than public charging in 2025, so more vehicles share each public charger. South Korea has the most public charging capacity per electric vehicle of any country, the IEA says.

  1. 1 Thailand 30
  2. 2 Brazil 24
  3. 3 World 11
  4. 4 South Korea Just over 2
Electric light-duty vehicles per public charging point in 2025 (per public charger in Thailand), on IEA estimates. (IEA (Global EV Outlook 2026), May 2026)
  • South Korea had over 9 kW of public charging capacity per electric light-duty vehicle in 2025 and just over 2 EVs per public charging point; its fast charging points, including ultra-fast, rose 10% from 47,000 to 51,000. (IEA (Global EV Outlook 2026), May 2026)
  • Brazil's public charging points rose close to 35% in 2025 while its electric light-duty fleet grew over 80%, so the number of electric vehicles per point rose from 17 to 24. (IEA (Global EV Outlook 2026), May 2026)
  • Thailand has nearly 12,000 public chargers, and the number of EVs per charger rose from 19 in 2024 to 30 in 2025. (IEA (Global EV Outlook 2026), May 2026)
  • Mexico's public charging points rose by less than 25% to 4,000 in 2025, and Chile's by 20% to just over 2,000. (IEA (Global EV Outlook 2026), May 2026)
  • India had 52,718 public charging stations in July 2026, of which 16,561 had fast chargers for cars, according to the BHEL portal. (Ministry of Heavy Industries, India (PIB), Jul 2026)
  • India's Ministry of Heavy Industries allocated ₹912.50 crore under FAME-II and ₹2,000 crore under PM E-DRIVE for public charging stations. (Ministry of Heavy Industries, India (PIB), Jul 2026)
  • On 1 March 2026, 6,645 public charging stations funded under India's FAME-II scheme were operating, out of 9,332 sanctioned. (Ministry of Heavy Industries, India (PIB), Mar 2026)

All figures except India's are IEA estimates; the IEA uses "charging points" for most countries and "chargers" for Thailand. India's figures come from the Ministry of Heavy Industries and count charging stations, each of which can have several charging points; the FAME-II figures cover scheme-funded stations only. The IEA's own figures for India count points on a different basis and are not used.

How many EV chargers does China have?

Most of China's charging connectors are private, and private connectors are growing faster than public ones on the National Energy Administration's count. Growth in the total has slowed through 2026 but is still above a third a year.

18.06m Sep 2025 20.09m Dec 2025 21.01m Feb 2026 23.06m Jun 2026 24.22m Aug 2026 24.78m Sep 2026
View data table
EV charging connectors in China, public and private, in millions, at the end of each period. Each figure comes from the NEA release for that month; the link is to the latest one.
PeriodValue
Sep 202518.06m
Dec 202520.09m
Feb 202621.01m
Jun 202623.06m
Aug 202624.22m
Sep 202624.78m
EV charging connectors in China, public and private, in millions, at the end of each period. Each figure comes from the NEA release for that month; the link is to the latest one. (National Energy Administration (China), Oct 2026)
  • Private charging connectors numbered 19.570 million at the end of September 2026, up 44.0% in a year, while public connectors grew 16.3%. (National Energy Administration (China), Oct 2026)
  • China's public connectors had a combined rated power of 266 million kW in September 2026, about 51.10 kW per connector on average. (National Energy Administration (China), Oct 2026)
  • At the end of 2025 China had 20.092 million charging facilities, with 4.717 million public and 15.375 million private connectors, serving more than 40 million new energy vehicles; NEA says this is the world's largest EV charging network. (National Energy Administration (China), Jan 2026)
  • It took five years to go from 1 million chargers to 10 million in June 2024, and only 18 months to go from 10 million to 20 million. (National Energy Administration (China), Jan 2026)
  • Average charging power per connector at China's public charging sites reached 46.5 kW in 2025, and NEA put charging efficiency up 33% on a year earlier. (National Energy Administration (China), Jan 2026)
  • 71,500 charging piles had been built at expressway service areas by the end of 2025, covering more than 98% of service areas, and 19 provinces had chargers in every township. (National Energy Administration (China), Jan 2026)
  • At the end of September 2025 China had 18.063 million connectors, up 54.5%, of which 4.476 million were public, up 40%. (National Energy Administration (China), Oct 2025)
  • At the end of February 2026 the total was 21.010 million, up 47.8%, with 4.834 million public connectors. (National Energy Administration (China), Mar 2026)
  • At the end of June 2026 it was 23.057 million, up 43.2%, with 5.009 million public connectors, up 22.3%. (National Energy Administration (China), Jul 2026)
  • At the end of August 2026 it was 24.223 million, up 39.6%, with 5.160 million public connectors, up 19.5%. (National Energy Administration (China), Sep 2026)
  • China had more than 180,000 high-power charging connectors at the end of June 2026, and charging covered 98.61% of counties. (National Energy Administration (China), Jul 2026)
  • Over the 2026 May Day holiday, expressway chargers handled 3.98 million sessions and delivered 94.93 million kWh, 18.99 million kWh a day, 14.09% more than over the Spring Festival and a new high, NEA said. (National Energy Administration (China), Jul 2026)

China's National Energy Administration counts charging connectors, which it calls "guns", and splits them into public and private; growth rates are NEA's own. The expressway figure counts charging piles, a different unit. "High-power" is not defined on NEA's page. The end-2025 total is given as charging facilities, with its public and private parts counted in connectors. NEA's counts are the only Chinese charging counts used here; the IEA's estimates of charging points in China measure something different and are left out.

How many public chargers does the EU have?

Most public recharging points in the EU are AC chargers, and DC fast points are a smaller but fast-growing part of the network. EU law now sets a minimum of public charging power for each registered electric car and a maximum gap between fast-charging pools on main roads.

  1. 1 150 kW to under 350 kW 109,892
  2. 2 50 kW to under 150 kW 73,025
  3. 3 350 kW and above 31,034
  4. 4 Under 50 kW 12,206
Public DC recharging points in the EU-27 by power, September 2026, on the AFIR classification. (European Alternative Fuels Observatory, Sep 2026)
  • At the end of 2025 the EU-27 had 867,134 public AC recharging points and 194,756 DC points, up from 743,954 and 138,058 a year earlier. (European Alternative Fuels Observatory, Sep 2026)
  • On the same classification there were 156,850 public AC points and 14,773 DC points in 2020. (European Alternative Fuels Observatory, Sep 2026)
  • Ultra-fast DC points of 150 kW to under 350 kW rose from 3,911 in 2020 to 96,937 at the end of 2025. (European Alternative Fuels Observatory, Sep 2026)
  • Points of 350 kW and above rose from 1,182 in 2020 to 21,781 at the end of 2025. (European Alternative Fuels Observatory, Sep 2026)
  • Fast DC points of 50 kW to under 150 kW numbered 6,718 in 2020 and 64,776 at the end of 2025. (European Alternative Fuels Observatory, Sep 2026)
  • Medium-speed AC points of 7.4 kW to 22 kW rose from 143,880 in 2020 to 777,076 at the end of 2025 and 861,386 by September 2026; there were also 79,094 slow AC points under 7.4 kW and 10,964 AC points above 22 kW at the end of 2025. (European Alternative Fuels Observatory, Sep 2026)
  • Under the older counting method used until 2019, EAFO estimated 10,507 public points in the EU in 2012 and 133,947 in 2019. (European Alternative Fuels Observatory, Sep 2026)
  • EU countries must provide at least 1.3 kW of public charging power for each registered light-duty battery electric vehicle and at least 0.80 kW for each light-duty plug-in hybrid. (EUR-Lex (AFIR, Regulation (EU) 2023/1804), Sep 2023)
  • Along the TEN-T core road network, public charging pools for cars and vans must be at most 60 km apart in each direction, each offering at least 400 kW with one 150 kW point by the end of 2025, and 600 kW with two such points by the end of 2027. (EUR-Lex (AFIR, Regulation (EU) 2023/1804), Sep 2023)
  • Public points installed from 13 April 2024 must allow ad hoc payment with a widely used payment instrument, and from 1 January 2027 all public points of 50 kW or more on the TEN-T network, older ones included, must take payment cards or contactless card readers. (EUR-Lex (AFIR, Regulation (EU) 2023/1804), Sep 2023)

EAFO, the European Commission's observatory, counts public recharging points on the AFIR classification, AC and DC separately; 2026 figures run to September and EAFO's next update will replace them. The pre-2020 estimates use an older method and are not comparable with the AFIR series. AFIR figures are legal requirements, not counts. The IEA's figures for Europe in the first section blend EAFO with other data and are not compared with these.

How many public chargers do other European countries have?

Public networks differ a lot in make-up across Europe. The Netherlands relies mainly on AC points, while in Norway DC points make up a large part of the network.

  1. 1 France 46,028
  2. 2 Italy 18,503
  3. 3 Spain 13,713
  4. 4 Norway 12,275
  5. 5 Sweden 11,514
  6. 6 Denmark 9,976
  7. 7 Belgium 8,775
  8. 8 Netherlands 7,815
  9. 9 Poland 7,131
Public DC recharging points by country, September 2026, on EAFO data. Each country's figure comes from its own EAFO page; the link is to France's. Germany is covered in the next section on its national register. (European Alternative Fuels Observatory, Sep 2026)

All figures are EAFO counts of public recharging points from each country's page, with each country's DC figure for September 2026 in the chart. EAFO's AC counts for Norway (2025), Spain and Sweden fall between years with no explanation found, likely data revisions, so only their latest AC figures are given and no trend is drawn across those breaks; the Netherlands' AC count since 2025 is not given for the same reason. The IEA's country counts differ and are not used.

How many public charging points does Germany have?

Germany's official register shows a public network made up mostly of normal charging points, with high-power points above 299 kW growing quickly. The register lists the points that operators have reported to the Bundesnetzagentur, the federal network agency.

6,754 2017 11,166 2018 19,826 2019 30,953 2020 44,274 2021 61,965 2022 89,995 2023 131,125 2024 165,956 2025 198,382 2026
View data table
Public charging points in Germany on 1 January each year, on the Bundesnetzagentur register.
PeriodValue
20176,754
201811,166
201919,826
202030,953
202144,274
202261,965
202389,995
2024131,125
2025165,956
2026198,382
Public charging points in Germany on 1 January each year, on the Bundesnetzagentur register. (Bundesnetzagentur, Sep 2026)
  • 157,762 of Germany's public points were normal charging points and 56,572 fast charging points on 1 September 2026, against 141,077 and 44,864, or 185,941 in all, a year earlier. (Bundesnetzagentur, Sep 2026)
  • On 1 September 2026, Germany's public charging points could deliver 9.38 GW of charging power at the same time. (Bundesnetzagentur, Sep 2026)
  • 115,419 public points were rated above 15 kW to 22 kW and 39,407 above 3.7 kW to 15 kW. (Bundesnetzagentur, Sep 2026)
  • 21,526 points were rated above 149 kW to 299 kW, and 20,095 above 299 kW, up 35.6% in a year. (Bundesnetzagentur, Sep 2026)
  • 8,707 points were rated above 49 kW to 59 kW and 4,482 above 59 kW to 149 kW. (Bundesnetzagentur, Sep 2026)
  • Germany had 661 public fast charging points on 1 January 2017, 6,118 in 2021, 24,822 in 2024, 36,669 in 2025 and 50,008 in 2026. (Bundesnetzagentur, Sep 2026)
  • Germany had 13,003 operators of public charging points on 1 September 2026; EnBW mobility+ ran 11,376 points, with a rated power of about 1,057,288 kW, and E.ON Drive 4,034. (Bundesnetzagentur, Sep 2026)
  • North Rhine-Westphalia had 42,066 public points, Bavaria 40,874, Baden-Württemberg 35,963, Lower Saxony 21,427 and Hesse 16,528; Hamburg's 6,081 were 38.3% more than a year earlier. (Bundesnetzagentur, Sep 2026)
  • German public points had 140,616 Type 2 AC sockets and 19,799 Type 2 AC tethered cables on 1 September 2026. (Bundesnetzagentur, Sep 2026)
  • They had 57,022 CCS fast-charging connectors, up 26.2% in a year, while CHAdeMO connectors fell 3.8% to 3,273; 3,924 were Schuko domestic sockets. (Bundesnetzagentur, Sep 2026)

The Bundesnetzagentur register counts public charging points in operation as reported by operators; late reports can revise earlier dates. Fast points are Schnellladepunkte under German rules. Connectors are counted separately from points, and one point can have more than one connector. EAFO and the IEA publish different counts for Germany, which are not used.

How many public chargers does the UK have?

The UK's public network keeps growing, but the battery electric fleet is growing faster, so each public charger is shared by more cars than in 2025. London has many more public chargers per person than the rest of the UK, but much of its network is standard on-street chargers.

  1. 1 London 345.1
  2. 2 Scotland 231.6
  3. 3 Wales 185.5
  4. 4 UK 174.9
  5. 5 West Midlands 164.0
  6. 6 South East 159.4
  7. 7 South West 156.7
  8. 8 North East 150.2
  9. 9 East of England 150.2
  10. 10 East Midlands 121.5
  11. 11 North West 112.1
  12. 12 Yorkshire and the Humber 110.7
  13. 13 Northern Ireland 60.0
Public EV chargers per 100,000 people by UK nation and region, 1 July 2026. (DfT, Aug 2026)
  • On 1 October 2026 the UK had 180.0 public chargers per 100,000 people, and 42.9 per 100,000 rated 50 kW or above. (DfT, Oct 2026)
  • Those public chargers sat on 97,976 public charging devices. (DfT, Oct 2026)
  • England had 104,281 public chargers on 1 October 2026, Scotland 13,064, Wales 6,201 and Northern Ireland 1,192; London had 31,888. (DfT, Oct 2026)
  • On 1 January each year the UK had 57,552 public chargers in 2023, 78,214 in 2024, 102,771 in 2025 and 116,052 in 2026. (DfT, Oct 2026)
  • 13,281 public chargers were added to the UK network in 2025 and 5,119 in the first half of 2026. (DfT, Aug 2026)
  • There were 14 licensed battery electric vehicles for each public charger on 1 January 2025, 15 on 1 July 2025, 16 on 1 January 2026 and 17 on 1 April 2026, when 2,006,952 battery electric vehicles shared 119,080 chargers. (DfT, Aug 2026)
  • On 1 July 2026, 49% of UK public chargers were standard (3 kW to under 8 kW), 27% standard plus (8 kW to under 50 kW), 12% rapid (50 kW to under 150 kW) and 12% ultra-rapid (150 kW and above). (DfT, Aug 2026)
  • 52% were destination chargers, such as in car parks, 33% on-street, 11% en-route, such as at motorway services, and 4% other. (DfT, Aug 2026)
  • Per 100,000 people, Scotland had 59.1 chargers rated rapid or above, the South West 49.5, the East of England 48.8, London 27.9 and Northern Ireland 19.3, against 41.7 for the UK on 1 July 2026. (DfT, Aug 2026)
  • On DfT's older series of public charging devices, the UK had 2,283 in January 2015, 16,505 in January 2020 and 87,796 in January 2026. (DfT, Aug 2026)
  • New public charge points of 8 kW or more must offer contactless payment, prices must be shown in pence per kWh, and operators must run a free staffed helpline 24 hours a day. (legislation.gov.uk (Public Charge Point Regulations 2023), Nov 2023)

From January 2026 DfT counts public EV chargers, each able to charge a vehicle, in place of its older count of charging devices; the two series are not comparable, and a device can hold more than one charger. The October 2026 figures are DfT's monthly faster indicators, official statistics in development, and DfT's next releases will replace them; the breakdowns by power, location and region are from the 1 July 2026 release. The first-half 2026 additions are lower partly because one operator removed about 1,270 private chargers wrongly reported as public. Rapid means 50 kW or above. The legal reliability rule is a requirement; no official figure for measured reliability was found.

How many public chargers does the US have?

Most US public charging ports are Level 2. The Department of Energy also publishes a year-end count that adds private non-residential ports, so the two US totals on this page differ.

25,913 2014 34,289 2015 44,299 2016 52,337 2017 64,106 2018 85,253 2019 107,395 2020 128,703 2021 144,227 2022 176,032 2023 229,320 2024 271,488 2025
View data table
US EV charging ports, public and private non-residential, near the end of December each year. Part of the 2021 rise came from a change in counting method.
PeriodValue
201425,913
201534,289
201644,299
201752,337
201864,106
201985,253
2020107,395
2021128,703
2022144,227
2023176,032
2024229,320
2025271,488
US EV charging ports, public and private non-residential, near the end of December each year. Part of the 2021 rise came from a change in counting method. (US DOE (AFDC), Nov 2026)
  • Of the US public charging ports counted on 7 November 2026, 183,304 were Level 2, 79,854 DC fast and 688 Level 1. (US DOE (AFDC), Nov 2026)
  • New York had 20,595 public charging ports, Florida 15,490, Texas 13,208 and Massachusetts 11,877. (US DOE (AFDC), Nov 2026)
  • Counting public and private non-residential chargers, US station locations rose from 10,957 in 2014 to 85,692 at the end of 2025, and DC fast ports from 1,494 in 2014 and 17,539 in 2020 to 51,393 in 2024 and 68,599 in 2025. (US DOE (AFDC), Nov 2026)
  • ChargePoint had 93,247 ports listed in the DOE Station Locator, Blink 22,292, Electrify America 6,255, EVgo 5,291 and IONNA 1,784, and 17,990 listed ports were not on a network. (US DOE (AFDC), Nov 2026)

The DOE's Alternative Fuels Data Center counts charging ports; one station location can have many. The live public count excludes residential chargers and stations that are temporarily unavailable, and changes daily. The year-end series also includes private non-residential ports. Network figures cover every port each network lists in the Locator, some of them in Canada or private, and do not add up to the US total. California is covered in the next section on state counts. The IEA's US counts are on a different basis and are not used.

How many EV chargers does California have?

The California Energy Commission counts public chargers and shared private ones, and estimates home chargers separately. Its counts rose sharply in mid-2024 when it added new data sources, so earlier and later figures cannot be compared.

153,034 Aug 2024 179,241 Feb 2025 201,825 Sep 2025 217,214 Dec 2025 225,225 Jun 2026
View data table
Public and shared private EV charging ports in California since the August 2024 update, on California Energy Commission counts. Earlier counts used fewer data sources and are not shown.
PeriodValue
Aug 2024153,034
Feb 2025179,241
Sep 2025201,825
Dec 2025217,214
Jun 2026225,225
Public and shared private EV charging ports in California since the August 2024 update, on California Energy Commission counts. Earlier counts used fewer data sources and are not shown. (California Energy Commission, Oct 2026)
  • 76,091 of California's ports were public Level 2 and 21,861 public DC fast on 30 June 2026. (California Energy Commission, Oct 2026)
  • Limited-access, or shared private, ports numbered 125,352 Level 2 and 1,134 DC fast. (California Energy Commission, Oct 2026)
  • The Commission also estimates 1,179,497 chargers at homes of one to four units, counted separately. (California Energy Commission, Oct 2026)
  • On its earlier basis it counted 70,479 public and shared private ports in the fourth quarter of 2020 and 105,666 in the fourth quarter of 2023, with public DC fast ports rising from 5,404 to 10,677. (California Energy Commission, Oct 2026)

The California Energy Commission counts charging ports and combines several data sources, including the DOE locator, PlugShare, grant data and surveys. It warns that the mid-2024 jump comes from added data sources as well as new chargers, so there is a break in the series between the fourth quarter of 2023 and August 2024. The home charger figure is a statewide estimate. The DOE's own count for California is on a different basis and is not used.

How is the US paying for fast chargers, and how many will it need?

Federal money for highway fast chargers has been slow to turn into working stations, and NEVI obligations were paused for almost a year from February 2025. Chargers built with that money must meet federal minimum standards on power, number of ports and uptime.

  • Drivers without reliable home charging 65%
  • Ride-hailing drivers 21%
  • Long-distance trips 14%
Who the 182,000 public fast charging ports needed in the 2030 scenario would serve, from NREL's 2023 study. About 3 million vehicles would lack reliable home charging. (NREL (for US DOE), Jun 2023)
  • The NEVI Formula Program provides $5.0 billion to states for EV charging over fiscal years 2022 to 2026, $1.0 billion a year. (FHWA, Aug 2025)
  • By 6 February 2025, states had obligated $526.6 million of the $3.27 billion of NEVI funds available and spent $44.4 million. (FHWA, Feb 2025)
  • Around 550 NEVI-funded fast charging points were operating across 19 states in April 2026; another 1,000 had been fully awarded funding from 2022-25 budgets, and 42 states had 2026 plans approved after obligations were paused from February 2025 to January 2026. (IEA (Global EV Outlook 2026), May 2026)
  • By the end of 2024 only around USD 30 million of NEVI money had been spent on charging points then in operation. (IEA (Global EV Outlook 2025), May 2025)
  • NEVI corridor stations must have at least four networked DC fast charging ports able to charge four EVs at once, each supplying up to 150 kW at the same time, at 250 to 920 volts DC. (eCFR (23 CFR Part 680), Nov 2026)
  • Uptime for each port must be calculated every month over the previous twelve months. (eCFR (23 CFR Part 680), Nov 2026)
  • In the study's mid-adoption scenario, the 2030 network would include 26.8 million private Level 1 and Level 2 ports at homes, multifamily properties and workplaces, 182,000 public fast charging ports and 1 million public Level 2 ports. (NREL (for US DOE), Jun 2023)
  • It would need cumulative investment of $53 billion to $127 billion by 2030, including private home charging, of which $27 billion to $44 billion would be for public fast charging. (NREL (for US DOE), Jun 2023)
  • EV charging work in US electricity transmission and distribution added about 200 jobs in 2025, up 6% on 2024 and 37% since 2022. (US DOE (USEER), Aug 2026)
  • 56% of US adults were not too or not at all confident in 2024 that the country will build the charging infrastructure EVs need; 13% were very or extremely confident. (Pew Research Center, Jun 2024)
  • Lack of convenient public charging was a reason for not buying an EV for 56% of the US adults AAA asked in 2025, and fear of running out of charge for 55%. (AAA, Jun 2025)

FHWA figures are appropriations and obligations, not money spent on built chargers. The IEA's NEVI figures are shown because no FHWA count of working NEVI chargers was found. The federal standards apply to chargers built with NEVI and other federal highway funds, and the uptime rule is a requirement, not a measured result; a port counts as up only if it delivers power at the minimum level. The NREL figures are a 2023 scenario in which plug-in vehicles reach 50% of sales by 2030, and they leave out grid upgrade costs. Pew and AAA asked different questions of different samples; AAA's reasons were asked of adults unsure about or unlikely to buy an EV.

How many EV drivers charge at home?

Most charging happens at home or at work, but access to a home charger depends on housing. It is almost universal for EV owners in Norway and much lower in China, where few people live in houses.

  • Renters and flat owners 67%
  • Residential car parks 27%
  • Landlords 6%
Sockets funded by the UK EV chargepoint grant by type of recipient, to 1 January 2026. (DfT (OZEV grant statistics), Mar 2026)
  • In Europe more than 70% of EV recharging is done at home or at work. (European Alternative Fuels Observatory, Jan 2024)
  • Around 90% of EV owners in Norway can charge at home; 64% of Norway's population lives in detached or semi-detached houses. (IEA (Global EV Outlook 2026), May 2026)
  • Only around 50% of EV owners in China had home chargers in a 2025 survey, though another third could use shared residential chargers; 7% of China's residents live in single-family houses. (IEA (Global EV Outlook 2026), May 2026)
  • About 80% of car owners in Europe and 52% in China have access to a home charger, on IEA estimates. (IEA (Global EV Outlook 2026), May 2026)
  • About 6.00 million of the 132.54 million US primary homes owned or leased a battery electric or plug-in hybrid vehicle in 2024, and 4.68 million charged one at home. (EIA (RECS 2024), Mar 2026)
  • UK government grants had funded 485,201 home and workplace charger installations since 2013 by 1 January 2026, including 340,222 home chargers under the Electric Vehicle Homecharge Scheme, worth £140.8 million, and 40,333 under the Domestic Recharge Scheme. (DfT (OZEV grant statistics), Mar 2026)
  • The UK EV chargepoint grant had funded 32,451 sockets, worth £20.9 million, by 1 January 2026. (DfT (OZEV grant statistics), Mar 2026)
  • The Workplace Charging Scheme had funded 67,290 sockets in workplace car parks since 2016, 7,734 of them in the last 12 months. (DfT (OZEV grant statistics), Mar 2026)
  • UK residents in flats or rentals with off-street parking can get a grant of up to £500 per household for a home charger, more than ten European countries subsidise home charging, and the US 30% tax credit for charging equipment, up to $1,000 in low-income or non-urban areas, was set to expire on 30 June 2026. (IEA (Global EV Outlook 2026), May 2026)

The IEA's home charging figures come from surveys it cites and cover different groups: EV owners in Norway and China, car owners in Europe and China, so the two China shares are not compared. EAFO's European share is undated on a page last updated in January 2024. EIA's figures are preliminary survey estimates of US homes. OZEV figures count grant-funded installations only; DfT says the total number of UK home chargers is likely to be different.

How much does it cost to charge an electric car?

Charging at home on residential tariffs costs much less than buying petrol in most big markets. Public charging costs more, and a driver who used only public fast chargers would pay more to run an electric car than a petrol one.

13.15c 2020 13.66c 2021 15.04c 2022 16.00c 2023 16.48c 2024 17.23c 2025
View data table
Average US residential electricity price, cents per kWh, by year. Home charging is billed at residential rates.
PeriodValue
202013.15c
202113.66c
202215.04c
202316.00c
202416.48c
202517.23c
Average US residential electricity price, cents per kWh, by year. Home charging is billed at residential rates. (EIA, Oct 2026)
  • Electricity from public slow chargers can cost up to 150% more than residential tariffs. (IEA (Global EV Outlook 2026), May 2026)
  • A typical battery electric car uses around 70% less energy per kilometre than a petrol car of similar size, and home charging has saved owners USD 550 to USD 1,000 a year across the major markets since 2020. (IEA (Global EV Outlook 2026), May 2026)
  • In the US, a home-charged battery electric car saved about USD 860 a year against a petrol car in 2025: its energy cost nearly USD 600, up from just below USD 450 in 2020, against USD 1,400 for a petrol car. (IEA (Global EV Outlook 2026), May 2026)
  • In the UK, the yearly saving fell from more than USD 650 in 2020 to nearly USD 500 in 2025, as battery electric running costs rose over 80% to more than USD 1,000. (IEA (Global EV Outlook 2026), May 2026)
  • At April 2026 fuel prices, the saving from running a battery electric car rose 20% to 45% in most countries; in the US it rose from around USD 900 to USD 1,300 a year, and an EU driver doing 30,000 km a year could save USD 2,800. (IEA (Global EV Outlook 2026), May 2026)
  • The average US residential electricity price was 18.16 cents per kWh in August 2026. (EIA, Oct 2026)
  • US regular petrol averaged $3.097 a gallon in 2025, down from $3.951 in 2022; it was $2.168 in 2020. (EIA, Nov 2026)
  • Under the Ofgem price cap for October to December 2026, the average electricity unit rate on default tariffs paid by Direct Debit is 26.32p per kWh, with a 54.83p daily standing charge, and VAT is removed from electricity bills from 1 October 2026 to 31 March 2027. (Ofgem, Aug 2026)
  • From July to September 2026 the cap rate was 26.11p per kWh, with a 57.19p daily standing charge. (Ofgem, Aug 2026)

IEA running costs are model estimates of energy costs only, with home charging at average residential prices against a sales-weighted petrol car. The April 2026 figures use that month's higher oil prices, so the US figures for 2025 and April 2026 are not compared. EIA prices are US national averages. Ofgem's rate is the average default tariff across England, Scotland and Wales. Neither is turned into a cost per mile here, and public charging prices are not in either source.

How fast are public chargers, and how often are they used?

Public chargers are getting faster, but few cars can use the fastest ones, and chargers seldom deliver their full rated power. In Germany, subsidised public charging points are in use for only a small part of the day.

  1. 1 All battery electric models 670
  2. 2 Faster than 150 kW Roughly 160
  3. 3 Faster than 250 kW 50
Battery electric car models available in 2025 by top charging speed, from the IEA. (IEA (Global EV Outlook 2026), May 2026)
  • The average power of public charging points worldwide rose about 15%, from just over 40 kW in 2024 to nearly 50 kW in 2025. (IEA (Global EV Outlook 2026), May 2026)
  • 15 minutes at a 150 kW charger can add almost 180 km of range for a car able to use it, in mixed city and highway driving. (IEA (Global EV Outlook 2026), May 2026)
  • Electric cars able to use chargers above 250 kW are less than 5% of the vehicle stock, and the first 1,000-volt models came out in 2025. (IEA (Global EV Outlook 2026), May 2026)
  • Time-based use of over 32,000 subsidised public charging points in Germany rose from 1.5% in 2018 to almost 9% in 2022 and has stayed around 8% since; the busiest 5% are in use more than 25% of the time. (IEA (Global EV Outlook 2026), May 2026)
  • At those German chargers, the average ratio of delivered to rated power rose from around 30% in 2018 to nearly 35% in 2024, but at ultra-fast chargers above 350 kW it fell from 20% to 17%. (IEA (Global EV Outlook 2026), May 2026)
  • Ultra-fast charging in Germany takes about 20% longer at minus 5 to 0°C than at 20 to 25°C. (IEA (Global EV Outlook 2026), May 2026)

The German figures are IEA analysis of federally and state-subsidised charging points in the NOW GmbH database, not all German chargers, and are not compared with the Bundesnetzagentur register. Time-based use is the share of time a point is occupied and delivering power. Average power covers all public points worldwide on IEA estimates.

How many chargers are there for trucks, and how does battery swapping work?

Charging for electric trucks lags far behind the number of trucks, and most public chargers that can take a truck are shared with other vehicles. Battery swapping is a faster alternative, though each station needs a stock of spare batteries.

1,853 Q1 2026 2,159 Q2 2026 2,309 Q3 2026
View data table
EU-27 public charging locations dedicated to heavy-duty vehicles within mixed-use sites, by quarter of 2026. Only locations with at least one point of 350 kW or more are counted.
PeriodValue
Q1 20261,853
Q2 20262,159
Q3 20262,309
EU-27 public charging locations dedicated to heavy-duty vehicles within mixed-use sites, by quarter of 2026. Only locations with at least one point of 350 kW or more are counted. (European Alternative Fuels Observatory, Sep 2026)
  • Over 70,000 public charging points able to take heavy-duty vehicles were available worldwide in 2025, of which 1,200 could be verified as for trucks only; with more than half a million electric heavy-duty trucks, each would be shared by more than seven trucks on average. (IEA (Global EV Outlook 2026), May 2026)
  • In the third quarter of 2026 the EU had 712 public charging locations for heavy-duty vehicles used exclusively by them, up from 624 in the first quarter. (European Alternative Fuels Observatory, Sep 2026)
  • By 31 December 2025, truck charging pools of at least 1,400 kW, with one point of 350 kW or more, were required along at least 15% of the TEN-T network; by the end of 2030 they must be every 60 km on the core network, with at least 3,600 kW and two 350 kW points. (EUR-Lex (AFIR, Regulation (EU) 2023/1804), Sep 2023)
  • The EU's Alternative Fuels Infrastructure Facility, worth EUR 1 billion, funds 2,000 new heavy-duty charging points of at least 350 kW and nearly 600 of at least 1 MW across 19 projects in 11 member states. (IEA (Global EV Outlook 2026), May 2026)
  • Germany's "Power to Road" plan tendered 350 heavy-duty charging stations with 2,400 ultra-fast and 1,800 MW charging points, and the European Commission approved its EUR 1.6 billion budget in December 2025. (IEA (Global EV Outlook 2026), May 2026)
  • Shifting part of the charging load to daytime or off-peak hours can cut peak power demand at electric bus and truck depots by up to 60%. (IEA (Global EV Outlook 2026), May 2026)
  • A battery swap typically takes as little as 3 minutes for a car and less than 1 minute for a two- or three-wheeler. (IEA (Global EV Outlook 2026), May 2026)
  • The 23 spare battery packs at a typical NIO car swapping station cost about USD 170,000 to USD 230,000, and a whole NIO light-duty station costs from around USD 200,000 to just over USD 400,000 in China. (IEA (Global EV Outlook 2026), May 2026)
  • Gogoro runs more than 600,000 swap scooters across more than 12,500 stations in Chinese Taipei, at least 60,000 swap-ready two- and three-wheelers run in India, and Spiro has around 22,000 electric motorbikes in 7 African countries, the IEA reports. (IEA (Global EV Outlook 2026), May 2026)

IEA truck charging figures are estimates from sparse data. EAFO counts EU locations with at least one public point of 350 kW or more, either exclusively for heavy-duty vehicles or dedicated to them at mixed-use sites; its page uses both "points" and "locations". The IEA's own EU truck charger estimate uses other definitions and is not used. AFIR figures are legal targets, and the AFIF and Power to Road figures are funded or tendered plans, not built chargers. Swapping figures for NIO, Gogoro and Spiro are company figures as the IEA reports them.

How much electricity will EV charging use, and how many chargers will be needed?

EVs use a small share of the world's electricity today, and even with strong growth the IEA expects them to add only a few per cent to total demand by 2035. Most chargers added over the next decade will be at homes and workplaces.

  • Home 60%
  • Workplace and other private 35%
  • Public 5%
Where the world's charging points would be in 2035 in the IEA's Current Policies Scenario, a projection made in May 2026. (IEA (Global EV Outlook 2026), May 2026)
  • With no change to current policies, electricity demand from EVs could pass 1,500 TWh by 2035, around six times the 2025 level, raising total global electricity demand by only about 4%; in Europe EVs add more than 10% to total demand, against under 6% in China. (IEA (Global EV Outlook 2026), May 2026)
  • In 2035 the IEA projects EVs at 11.3% of Europe's final electricity demand under current policies (10.8% under stated policies), 5.8% (5.9%) of China's, 1.0% (1.7%) of the US's and 4.1% (4.6%) of the world's. (IEA (Global EV Outlook 2026), May 2026)
  • In one study of a region in northern France, smart charging could cut 2040 peak grid loads by 6% and vehicle-to-grid charging by 9%; in San Francisco, vehicle-to-grid charging could avoid three-quarters of transformer overloads by 2050 against uncontrolled charging, studies cited by the IEA found. (IEA (Global EV Outlook 2026), May 2026)
  • In the IEA's Current Policies Scenario, over 350 million charging points are added worldwide from 2026 to the end of 2035, and the number of electric light-duty vehicles per public point rises to 19 in 2035. (IEA (Global EV Outlook 2026), May 2026)
  • Europe would need to add an average of 300,000 public charging points a year to the end of 2035 in that scenario, and the EU's public stock would reach 2 million by 2030 and roughly 3.5 million by 2035. (IEA (Global EV Outlook 2026), May 2026)
  • France aims for 400,000 publicly accessible charging stations by 2030 and the UK for at least 300,000 public charging stations; Germany has a target of 1 million public charging points, while its NLL estimates 380,000 to 680,000 will be needed. (IEA (Global EV Outlook 2026), May 2026)
  • Japan announced a target in 2023 of 300,000 public chargers by 2030, including 30,000 fast chargers, which would need almost an eightfold increase; Indonesia's target is 32,000 public charging points by 2030. (IEA (Global EV Outlook 2026), May 2026)

All figures are IEA estimates or projections made in May 2026; "current policies" is the IEA's Current Policies Scenario and "stated policies" its Stated Policies Scenario. National targets are as the IEA reports them, and governments use different units (stations, points or chargers), so they are not compared or charted together or set against the national counts above. The grid results come from third-party studies the IEA cites, not from IEA modelling.

Glossary

EV
Electric vehicle: battery electric or plug-in hybrid, unless a figure says otherwise.
LDV / HDV
Light-duty vehicles (cars, SUVs, pickups and vans) and heavy-duty vehicles (trucks and buses).
Charging point, connector, port, device, station
The units different producers count. A station or location can hold several devices; a device can hold several points or chargers; a point can have more than one connector. They are not interchangeable.
AC / DC
Alternating current charging, usually slower and common at homes and on streets, and direct current charging, used by fast and ultra-fast chargers.
Level 1 / Level 2 / DC fast
US charger classes: Level 1 uses a standard household outlet, Level 2 a 240-volt supply, and DC fast chargers deliver direct current at high power.
kW / kWh / TWh
Kilowatt (charging power), kilowatt-hour (energy) and terawatt-hour (one billion kWh).
AFIR / TEN-T
The EU Alternative Fuels Infrastructure Regulation, which sets charging targets, and the Trans-European Transport Network of main roads it applies to.
EAFO / AFDC
The European Commission's European Alternative Fuels Observatory and the US Department of Energy's Alternative Fuels Data Center.
NEA
China's National Energy Administration, which publishes the country's official charging counts.
NEVI
The US National Electric Vehicle Infrastructure Formula Program, federal funding for highway fast charging.
OZEV
The UK Office for Zero Emission Vehicles, which runs the charging grant schemes.
CCS / CHAdeMO
Two plug standards for DC fast charging.
V2G
Vehicle-to-grid charging, in which a car can send power back to the grid; smart charging only shifts when a car charges.
Crore
An Indian unit of 10 million.

Methodology and sources

Figures come from official statistics bodies and regulators (China's NEA, the European Commission's EAFO, Germany's Bundesnetzagentur, the UK's DfT and Ofgem, the US DOE, EIA and FHWA, the California Energy Commission and India's Ministry of Heavy Industries), the legal texts of charging rules, the IEA, a US national laboratory and survey bodies. Each figure links to the body that produced it, with the date; IEA reports are cited to the PDF files the IEA publishes. Each country's charger counts come from one producer, and each figure says what it counts: points, connectors, chargers, devices, ports or stations. Counts from different producers are not added up, compared or charted together, and no trend is drawn across a break in a series. Forecasts, targets and legal requirements are labelled as such. Tesla Supercharger counts are left out because they could not be checked against a citable source. The page is reviewed monthly and the date is shown at the top.